Portfolio
Projects
- Uncategorized
The project involves the total reconstruction and widening of two miles of the Turnpike’s east-west mainline (Interstate 76) between Milepost
- Uncategorized
The bridge consists of two inclined towers and cabled stayed span of 160’-0”. The free span is over Jones Branch
- Uncategorized
A&A Consultants, Inc. performed Structural Analysis and Load Rating using Allowable Stress Design method, PennDOT’s BAR7 program, and STAAD software.
- Uncategorized
A & A provided construction management services on the Port Authority of Allegheny County’s West Busway project, which consisted of
- Uncategorized
A&A provided construction managment services for this 1,500,00-square foot convention, conference and exhibition building along the banks of the Allegheny
- Uncategorized
Sixth, Seventh and Ninth Street Bridges are located just north of Pittsburgh, crossing over the Allegheny River. These three bridges