Our Project

Dongola Bridge

Description

Dongola Bridge is one of the major projects ubdertaken by Ministry of Dams and Bridges to develop the northern regions of Sudan. The bridge will act as an
important link within the roads network starting at Port Sudan on the Red Sea Coast passing through El Sileim across the Nile from Dongola and extending northwards to the Wadi Halfa area near the border with Egypt and connecting to Shiryan Al Shamal Highway leading to Omdurman.

ENGINEERING DATA
Bridge length: 696 m
Bridge width: 20.6 m 2 lanes in each direction with pedestrian passage ways.
Number of Spans: 17

Type of Construction
Superstructure: Prestressed Concrete girders with cast-in-place reinforced concrete deck
Substructure: Bored reinforced concrete piles supporting 3 column piers.

Project Info

Lorem ipsum

Style Here to Style Below Item.

Owner:

Ministry of Dams and Bridges

Period of Completion:

26 months

Location:

Dongla – Sudan

Project Cost:

$51,000,000

Contact Info

A&A Consultants, Inc., is an award-winning design firm that specializes in Geotechnical, Structural, and Civil Engineering.